Skip to main content

Case Study · Technopolis Athens

Doers Summit 2025

A multi-stage production at Technopolis with three venues running in parallel and demanding requirements for visuals, sound and lighting. CONEQ Hellas delivered the full AV production and technical coordination — stability and predictable execution at every moment.

Venue
Technopolis, City of Athens
Duration
2-day event · 4-day setup
Crew
15 technicians on site

How CONEQ Hellas delivered

  1. At a glance

    Quick Facts

    Venue
    Technopolis, City of Athens
    Stages
    Nei Fournoi · Miltiadis Evert Amphitheatre · Workshop (3 stages)
    Event duration
    2 days (setup & execution: 4 days)
    LED Walls
    P2.5 — 8x3.5m (main) & 5x3m (secondary)
    Lighting & Effects
    Moving-head fixtures · 12W laser show · special effects
    CONEQ crew
    15 specialist technicians on site
    Outcome
    Rock-solid technical delivery · zero downtime
  2. The challenge

    Three venues, one flow, zero tolerance for downtime.

    The summit required tight coordination across three different venues with parallel programme tracks and rapid content changeovers.

    The main stage also had to flip instantly from conference mode into a full networking party — a complete atmosphere change with no delays and no risk to the production flow.

  3. Our approach

    How CONEQ Hellas delivered

    1. 01 · Visuals

      High-impact P2.5 LED walls

      We designed and installed high-resolution (P2.5) LED walls with a central 8x3.5m screen that guaranteed razor-sharp readability for the presentations and delivered a commanding visual footprint on the main stage.

      A second 5x3m install supported the additional programme tracks and content playout.

    2. 02 · Atmosphere

      Day-to-night transformation in minutes

      The main stage flipped straight into a networking-party setting via a tailored lighting design: moving-head fixtures, a 12W laser show and bespoke effects.

      The result was a full atmosphere change without breaking the production flow.

    3. 03 · Sound

      Independent PA systems per stage

      Each of the 3 stages had its own dedicated sound system so that keynotes stayed crystal-clear and 'speech-first', the party carried a full, dynamic mix, and no venue bled into another.

    4. 04 · Coordination

      Onsite crew & full technical direction

      A 15-person CONEQ crew was on the floor for 4 days of setup & execution, handling presentation cueing and programme flow, live mixing for sound and lighting, and continuous QA with immediate troubleshooting wherever needed.

  4. Outcome

    Rock-solid technical delivery across both event days.

    • 3 stages running stably in parallel
    • 13m total LED length (8x3.5m & 5x3m)
    • Laser & light show that fully elevated the networking event
    • Zero downtime over 4 consecutive days of setup & execution

Client testimonial

A huge thank you from our team to yours for all the help provided prior and during the event. Everyone was super supportive and professional and we greatly enjoyed working with you!
Andry Achlileos·COO @ the Doers

Need the same level of technical delivery?

Get in touch with CONEQ Hellas for a technical brief and a proposed setup for your own event.